Course Hive
Search

Welcome

Sign in or create your account

Continue with Google
or
DOCUMENTATION REQUIREMENTS FOR COMMISSIONING A GREENFIELD PROJECT.
Play lesson

Chemical plant commissioning procedure - DOCUMENTATION REQUIREMENTS FOR COMMISSIONING A GREENFIELD PROJECT.

5.0 (1)
25 learners

What you'll learn

This course includes

  • 3.3 hours of video
  • Certificate of completion
  • Access on mobile and TV

Summary

Full Transcript

A number of documents are required before we move on to the commissioning stage. Here in this video, please find the explanation of documents required before starting the commissioning of a project. The main documents required for the commissioning of a chemical plant incude the following: 1. Plot Plan 2. PFD 3. P&ID 4. ISOMETRIC DRAWINGS 5. GENERAL ARRANGEMENT DRAWINGS So go through this video for the details bof these documents. In the next video, we will move to the steps of pre-commissioning overview. #pfd #p&id #isometric #plotplan #projectdocuments #greenfieldproject #brownfieldproject #chemicalengineering #precommissioning #commissioning #chemicalindustry #chemicalengineeringbasics

Course Hive

Continue this lesson in the app

Install CourseHive on Android or iOS to keep learning while you move.

Related Courses

FAQs

Course Hive
Download CourseHive
Keep learning anywhere